Nyadi Hydropower IPO Result date is fixed now. According to issue manager, the IPO result published on Friday, October 22, 2021. The pre-allotment of Nyadi Hydro IPO was completed on Oct 19, 2021. The Nyadi Hydropower IPO was opened for general public from Ashwin 15 to Ashwin 19, 2078. A total of 22,50,000 units shares, 2% (45000 units) of the total offered shares allocated to its employees and 5% (1,12,500 units) have been allocated for the mutual funds. The remaining 20,92,500 units shares has allocated for the general public. You can check IPO Result from MeroShare CDSC when it will be published on Nyadi Hydropower IPO Result date.
How to Check IPO Result of Nyadi Hydropower Ltd

Are you looking for How to Check IPO Result of Nyadi Hydropower Ltd ? If yes, we shares the five ways, you can check the IPO result of Nyadi Hydropower IPO Result on the published date. You can find first and fast of the IPO result if you will try all the methods.
- Check Nyadi Hydropower IPO Allotment from iporesult.cdsc.com.np ipo result 2021 (CDS and Clearing Limited)
- Check Nyadi Hydropower IPO from Global IME Capital IPO Result Official page
- Check Nyadi Hydropower IPO Result from NMB Capital IPO Result or NMB Capital Mero Share
- You can also check IPO Result from Mero share Account www.meroshare.cdsc.com.np
- You can also check IPO Result from IPO Result App or Nepali Share App

Global IME Capital Limited of Nyadi Hydropower Limited IPO is the issue manager and NMB Capital Limited is the co-issue manager who secured the IPO. The Nyadi Hydropower company Limited has 1,50,00,000 registered shares. Out of which 40,50,000 shares has issued to the public and employees. The company’s paid-up capital is 27%.
CARE Ratings for Ngadi Group Power IPO
CARE Ratings for Ngadi Group Power IPO is ‘CARE-NP BBB – (Is) [Pronounced triple B Minus (Issuer Rating)]’. Issuers with this rating are considered to have a moderate degree of safety regarding timely servicing of financial obligations in Nepal as per standard rules.
Nyadi Hydropower Project
Although Nepal’s theoretical hydroelectric potential is huge, to date, Nepal has managed to harness only small fraction of such potentiality resulting scarcity of electricity in Nepal. Government’s efforts are not only enough to fulfill the higher demand for electricity in the country. Realizing the fact, the government policy is now to maximize private sector involvement in the sector of water resource development for the construction of large, medium as well as small hydropower projects to continuously fulfill the electricity demand of the country and also to attract the foreign investment for the development of the water resource by developing the Hydropower projects. In this back drop, Nyadi Hydropower Limited was established to develop Nyadi Hydropower Project in the consortium of the Butwal Power Company (98.18%) and the Lamjung Electricity Development Company Limited (1.81%).
Nyadi Hydropower Project (NHP) is a run-of-river type project, located in Lamjung District of Western Development Region of Nepal. The NHP was first identified in 1993 during the preparation of the Small Hydropower Master Plan. COWEL International (P) Ltd., sponsored by German Development Agency (GTZ) had conducted the first pre-feasibility study.
Project Area
The entire Project area (i.e. intake to powerhouse) is located within the Bahundanda Ward No.6, Marsyangdi Rural Municipality in Lamjung District, Gandaki Zone. NHP is located on the right bank of Nyadi Khola which is one of the tributaries of the Marsyangdi River. Intake site of the Project is located approximately 2.50 km upstream of Naiche village of Bahundanda Ward No.6 and about 9 km upstream of the confluence of the Nyadi and the Marsyangdi Rivers. Similarly, the powerhouse is being constructed near Thulobeshi village of Bahundanda Ward No.6 which is about 3 km downstream from Naiche Village.
Technical features of the project | |
Type of the project | Run-of-the River |
Project location | Bahundanda VDC, Lamjung District |
Dam site | Naiche, Bahundanda Ward 6 |
Powerhouse site | Thulobesi, Bahundanda Ward No.6 |
Installed Capacity | 30 MW |
Average annual energy | 168.5 GWh |
Gross head | 333.9 m |
Design flow | 11.02 m3/s |
Catchment area at intake site | 154.7 km2 |
Design Flood Discharge | 509 m3/s (100 Yrs Flood) |
Settling basin | 62 m (L), 8 m (W), 18 m (H) |
Length of Headrace tunnel | 3.840 km |
Turbine type | Vertical Axis Pelton |
Turbine Installation | 2 nos. with 15 MW capacity |
Transmission Line | 6 km long of 132 kV capacity |
Construction period | 4 years |
Accessibility The nearest town from project site is Beshisahar, which is the head quarter of Lamjung district and is about 176 km west from Katmandu, capital of Nepal. The first 130 km section of the highway in between Katmandu to Dumre is a part of Prithivi Rajmarg and the rest 46 km from Dumre to Beshisahar is linked by Bhanubhakta Highway. The project site is accessed by a seasonal road of about 20 km from Beshisahar to Thakanbesi. Nyadi Hydropower Limited has constructed remaining seasonable road upto proposed intake site which is at Naiche Village of Bahundanda Ward No.6, of Marsyangdi Rural Municipality. The road passes through powerhouse site at Thulobesi of Bahundanda.